A 1 kW plant receives ₹30,000. A 1.5 kW plant receives ₹45,000. A 2 kW plant receives ₹60,000.
The ₹78,000 central subsidy is still being paid. It has a published end date of 31 March 2027, and a few rules that make individual claims fail.
If a vendor has told you to sign this week because “the government is stopping the ₹78,000,” or a forward says the scheme is already dead, you are looking at a real deadline dressed up as a cancellation. Electricity bills are rising, and households that want rooftop solar are right to ask whether the money will still be there. The notification answers that more clearly than the forwards do.
The scheme is active and funded through the end of financial year 2026–27. What has changed since launch is enforcement. Domestic-content rules, portal checks, and crowded DISCOM inspection calendars are rejecting or delaying individual files. Those files get retold as “the subsidy has stopped.” The programme itself is still open and still paying.
Four separate things are circulating as one rumor.
Some installers tell a household the subsidy ends “this month” to force a signature. Urgency gets more reasonable as 31 March 2027 approaches, because installation and inspection take time. A claim that the Centre has already pulled the scheme is still false. Ask for the MNRE order. The order that exists sets 31 March 2027.
Subsidised plants must use domestically manufactured modules made from domestically manufactured cells. That Domestic Content Requirement is an essential condition in the guidelines: one non-DCR module makes the whole installation ineligible. MNRE also applies its Approved List of Models and Manufacturers, including List-I for modules and List-II for cells, to plants that claim assistance. Households that accepted a cheaper imported-cell panel, then saw the claim refused, often describe the refusal as the government stopping payment. The payment rule is unchanged. The hardware missed it.
Clause 5(p) of the June 2024 guidelines lets a consumer voluntarily forgo central assistance through a Give It Up option on the national portal. Someone who gives the subsidy up may install without DCR modules. The point of the clause is to leave assistance for other households, not to withdraw it. MNRE has also clarified that residential net-metering consumers who give up the subsidy, apply through the national portal, and stay inside the scheme period are exempt from ALMM List-II for cells until 31 March 2027. Cropped screenshots of that optional route became headlines about the Centre withdrawing support. Households that want ₹78,000 still have to install DCR equipment.
The ministry told the Lok Sabha that, as on 4 August 2026, the scheme had benefited more than 50 lakh households. Applications are still arriving faster than some distribution companies can inspect plants and fit net meters. A delayed credit is a queue. Payment continues by Direct Benefit Transfer after the DISCOM report. In Kerala, that queue sits at the KSEB section office — covered in how to get ahead of the KSEB rush before March 2027.
The scheme is time-bound. Clause 1(d) of the residential CFA guidelines says the implementation period runs till 31 March 2027. The original sanction, Order No. 318/17/2024-GCRT dated 16 March 2024, approved an outlay of ₹75,021 crore toward one crore households. Unless the Union Cabinet notifies an extension, this assistance structure closes with financial year 2026–27.
There is a second cap in clause 8(c). The portal is limited to 1 crore active applications. As on 4 August 2026, MNRE had received 77,44,376 applications. Applications received and applications still active are different counts, so 77,44,376 is the number submitted. Demand is already most of the way to the one-crore household target the Cabinet approved. A future extension would be a fresh Cabinet decision. MNRE has not notified one. Later phases of Indian rooftop programmes have often paid less per kilowatt, so an unannounced PM Surya Ghar 2.0 has no published rate to plan against.
| Viral claim | What the record shows |
|---|---|
| The government has stopped paying the solar subsidy. | Payment is continuing. As on 4 August 2026, MNRE had released ₹28,024 crore and covered more than 50 lakh households. |
| The ₹78,000 amount has been cut. | The general-category cap is still ₹78,000, from ₹30,000 per kW on the first 2 kW plus ₹18,000 on the next 1 kW. Special-category states cap at ₹85,800. |
| An application filed on 31 March 2027 still gets the money. | The implementation period ends that day. Assistance follows installation, net metering, and DISCOM inspection. A last-day registration does not complete those steps. |
| The scheme is already out of budget. | The 2026–27 Budget Estimate for the scheme is ₹22,000 crore, up from a ₹17,000 crore revised estimate the year before. The programme is also capped at one crore households. |
These rates apply to applications under the guidelines in force since 13 February 2024. The subsidy follows module capacity in kilowatts. Inverter kilowatts are ignored. Battery storage can be added, and the central assistance stays on the module capacity alone.
A 1 kW plant receives ₹30,000. A 1.5 kW plant receives ₹45,000. A 2 kW plant receives ₹60,000.
Capacity between 2 kW and 3 kW is paid at ₹18,000 per kW. A 2.5 kW plant receives ₹69,000.
A 3 kW, 5 kW, or 10 kW home system receives the same ₹78,000. Special-category states and UTs cap at ₹85,800.
Group housing societies and resident associations can claim ₹18,000 per kW (₹19,800 in special-category areas) for common facilities, including EV charging, up to 500 kW and within 3 kW per home. States may add their own top-up through the national portal. Kerala has no separate state solar subsidy in 2026. Other state top-ups change, so read the live figure on pmsuryaghar.gov.in before you budget for one. Special-category areas are Uttarakhand, Himachal Pradesh, Jammu and Kashmir, Ladakh, the North East including Sikkim, Andaman and Nicobar Islands, and Lakshadweep.
The subsidy is paid only after the rest of the file is finished. A typical path is:
That sequence commonly takes 45 to 60 days when meters and inspectors are available. It takes longer when they are not. A start in February or March 2027 can be pushed past the implementation date by one delayed inspection. The same rush lifts demand for compliant DCR modules, which lengthens delivery. The portal can also stop accepting new active applications once the one-crore ceiling is reached, which is a second way the door closes before the calendar does.
Figures for households and rupees released are from the Ministry of New and Renewable Energy’s Lok Sabha replies: ₹28,024 crore and more than 50 lakh households as on 4 August 2026, and the Kerala break-up of 3,17,390 households and ₹2,073.80 crore as on 31 July 2026. Slab rates are from the 7 June 2024 operational guidelines. Portal status can move. Check pmsuryaghar.gov.in before you rely on a quote.
We size the plant from your KSEB bill and explain what the national portal will actually pay.